1 SB-6E, SB-10E and SB-16E CONVECTION STEAMER ON AN ELECTRIC BOILER BASE INSTALLATION – OPERATION – MAINTENANCE BLO
10 4.0 PERIODIC MAINTENANCE Never spray water into electric controls. Be sure to flush your boiler water level control daily. F
11 CLEANING 1. Keep exposed cleanable areas of unit clean at all times. 2. Thoroughly wash oven cavities, door liners, and pan racks at the end
12 ADJUSTMENTS DESCALING BOILER It is recommended that the boiler be checked every 90 to 120 days for scale build up. Regular maintenance should
13 TO CALIBRATE PRESSURE SWITCHES Pressure switch range is from 1 to 15 psi. Adjust all settings to maximum on high signal adjustment screw. Adjus
14 5.0 TROUBLESHOOTING DOOR LEAKS 1. Check for damage to door gasket. WATER ACCUMULATES IN THE COMPARTMENT 1. Compartment drain screen clogged
15 6.0 COOKING CHART The following table lists suggested cooking times and weights. These times, which will vary depending on initial product tempe
16 PRODUCTS TO BE COOKED IN PERFORATED PANS Product Timer Setting in Minutes Weight Per Pan Clams Frozen Fresh, Cherrystone 10 - 12 5 - 6 3 Doz
17 PRODUCTS TO BE COOKED IN PERFORATED PANS Product Timer Setting in Minutes Weight Per Pan Brussel Sprouts, Frozen 6 5 Lb Cabbage, Fresh, 1/6 Cut
2 IMPORTANT NOTES FOR INSTALLATION AND OPERATION It is recommended that this manual be read thoroughly and that all instructions be followed careful
3 TABLE OF CONTENTS DESCRIPTION PAGE Important Notes ...
4 1.0 SERVICE CONNECTIONS REAR FLANGED FOOT DETAIL7/16" [11mm] HOLES ON 2.5 [63] B.C.2 EQUALLY SPACED ØS6 [152]5.75 [146]8.75 [222]28 [711]16.7
5 2.0 INSTALLATION INSTRUCTIONS Ideally an exhaust system should be located directly above the appliance to exhaust steam and heat generated by the
6 3.0 OPERATING INSTRUCTIONS BOILER SECTION Electrically powered steam generators are available with standard boiler controls or ASME CSD-1 co
7 3.0 OPERATING INSTRUCTIONS (Continued) Normal Boiler Operating Cycle Water Fill Cycle On the initial filling of the boiler, units equipped with
8 3.0 OPERATING INSTRUCTIONS (Continued) High Pressure Condition, CSD-1 Controls A high pressure safety switch is installed on the boiler. Should
9 COOKER SECTION CAUTION: Live steam and accumulated hot water in the compartment may be released when the door is opened. Start-up procedure
Komentáře k této Příručce